- Joined
- Jul 31, 2018
- Messages
- 68
- Likes
- 19
- Degree
- 0
I was working with a partner on a few sites (ranging from afill, content and lead gen). All are going well with good growth. He has decided to move on to another job (and graciously leaving the sites to me). I was mainly looking after; getting a site from idea to fully built out, link building, content plans/ briefs and communicating with writers.
We have tried to do a in depth handover but I'm worried I will be missing some routine tasks, I have tried to document everything to ensure I am capturing it all with frequency of tasks for each site (we have a main aff site, a content site and two lead gen sites)
Without being ripped to shreds would people mind just throwing in the ring a few tasks they deem important for ongoing maintenance/ growth.
We have tried to do a in depth handover but I'm worried I will be missing some routine tasks, I have tried to document everything to ensure I am capturing it all with frequency of tasks for each site (we have a main aff site, a content site and two lead gen sites)
Without being ripped to shreds would people mind just throwing in the ring a few tasks they deem important for ongoing maintenance/ growth.